Complex of copper-concentration plant with complete production process cycle

ENSOLUT GROUP performed the development of a complete set of detailed documentation for complete production process cycle CCP complex construction.

The complex provides for the maintenance of all mining and auxiliary equipment of the mining and concentration plant. Facility composition is as follows:

  • Maintenance workshop for mine vehicle.
  • Maintenance workshop for machines.
  • Maintenance workshop for excavators with a gantry crane.
  • Mining vehicle maintenance workshop.
  • Repair workshop of small-sized vehicle.
  • Tire fitting area.
  • Welding area.
  • Conservation site.
  • Spare parts warehouse.
  • Warehouse of cylinders.
  • Central security check point.
  • Technical Control point.
  • Service building.
  • Boiler house.
  • Mining vehicle wash.
  • Administrative building.
  • Interplant service lines networks.
  • On-site transformer substations.

Complete complex of administrative and service buildings with a service staff of 600 persons is located at the site.

The provision is made for its own boiler house and SCP, which allow working autonomously from other sites.

Mining vehicle wash is envisaged with the entire complex of wastewater treatment facilities to minimize dirty effluents into the general system.

There are a number of workshops and a tire fitting area for the maintenance of various equipment from mining dump trucks to small-sized equipment.

Considering the huge dimensions of the equipment, all networks are mostly laid underground.

The frames of all buildings are designed according to 8 points site seismicity.