ENSOLUT GROUP took part in the development (adaptation) of detailed design (DD) for the gas processing plant (GPP) with the infrastructure.

GPP main parameters:

  • construction area – 45,24 ha.
  • personnel number – 912 persons.
  • GPP capacity – 5 5 bln.m3/year of raw natural gas with a high content of CO2 (11.8%) and H2S (6.9%) at a pressure of 13.0 MPa.
  • capacity in terms of processed (treated) gas (as per O’ZDST-948-2016) – 4,5 bln. m3/year at a pressure of 6,0 МPа;
  • capacity in terms of liquid degassed sulfur – 500.8 thous. t/year;
  • laboratory – with an area of 1253 m2 and staff number of 50 persons;
  • buildings number – 27 pcs., of total area more than 22 thous. m2.

GPP composition: 

  • two process lines with a capacity of 2.5 billion m3/year;
  • utilities, infrastructure and offsites (UI&O);
  • sulfur filling and solidification site;
  • buildings and shelters;
  • fire-fighting station with gas rescue service.

Main technological processes:

  • primary separation of the gas-liquid mixture, trapping of liquid plugs;
  • gas purification from acidic H2S components and mercaptans according to the Licensor’s technology (Shell Global technology) using a two-component amine solvent (Sulfinol-M);
  • gas purification from acidic CO2 and COS components according to the Licensor’s technology (Shell Global technology) using a two-component amine solvent (Sulfinol-Х); 
  • gas drying by adsorption method;
  • utilization of gas containing acidic components according to the Licensor’s technology (Shell Global technology) using Klasus and SCOT processes with the production of degassed liquid sulfur;
  • utilization of acidic water and effluents by evaporation and chemical oxidation.